How is PV mounted on a tiled or slate roof?
Most pitched commercial roofs use a rail-and-hook system. A hook passes under the tile or slate and fixes to the rafter, a rail bolts to the hooks, and the modules clamp onto the rails. Hook design follows the covering.
| Covering | Hook approach, from manufacturer data |
|---|---|
| Concrete tiles | K2's SingleHook 3S Light is described as ideal for concrete roof tiles and takes rafters from 48 mm; SingleHook 2 is for flat concrete tiles that meet BS EN 490 |
| Clay tiles, pantiles, plain tiles | K2 offers hooks for almost all clay tiles, pantiles and concrete tiles, a Z-shaped hook for pantiles and a 3S long hook for tiles with a larger overlap |
| Flat tiles with a replacement tile | K2's FlatTile hook is used only with a sheet metal roof tile |
| Slate | K2 says its SolidRail suits slate tiles; Enstall lists a slate version of ClickFit Evo built on the same four base components |
Some hooks mean cutting or milling tiles. K2 points to stainless hooks in its SolidRail range for low processing of the tiles and lists a webinar on tiled roofs with a tile milling machine. Enstall says its Universal Roof Hook needs no drilling into the roof structure, with a Truss Hook or Roof Hook Pro for those who prefer screws.
Rafter width and spacing decide where hooks can go. K2's SingleHook 3S Light takes rafters from 48 mm, with narrow rafters from 36 mm possible using a wood construction screw, and K2 offers SingleBoard for difficult rafter distances.
What does MCS 012 test, and does it apply to commercial roofs?
BRE describes MCS 012 as specifying the requirements and testing needed to show the performance of pitched roof installation kits for PV modules and solar thermal collectors. BRE tests to the MCS 012 method for weathertightness and wind resistance on a configurable wind uplift rig and also certifies products against it. It separately tests tile clips and drive-in hook fixings to annexes of BS 5534.
K2 marks many of its hooks and rails as MCS certified. Since 10 August 2026 the MCS Product Directory has shown only mounting products certified to issue 3.0, bar a few bespoke extensions.
MCS itself covers installations up to 50 kW, and MIS 3002 applies to systems up to a maximum DC output of 50 kWp. A larger commercial array is not an MCS installation, but a kit's MCS 012 certificate is still useful evidence to request, alongside a wind and snow calculation for your roof. MIS 3002 also asks the contractor to have the building assessed by a competent professional for suitability, so the check does not stop at the kit.
How are wind and snow loads checked on a pitched roof?
BRE's Digest 489 sets out wind loads for roof-mounted solar systems in the UK, based on the wind Eurocode and its UK National Annex. BSI's UK National Annex to Eurocode 1 for snow loads sets the UK decisions for the parameters in BS EN 1991-1-3. BSI also says first-generation Eurocodes stay the applicable UK standards until 30 March 2028 unless the relevant authority or project specification says otherwise.
A kit certificate is not a roof check. BSI notes that BS 5534, the slating and tiling code, does not cover the structural design of the roof.
Part A of the Building Regulations requires combined dead, imposed and wind loads to be sustained and transmitted to the ground, so rafters, trusses and their connections need a structural engineer's check for the added dead load and the changed wind and snow actions. Manufacturers' software, such as K2 Base, supplies static confirmation for their rails within that frame. The commercial PV installations guide shows where the structural appraisal falls in a programme. The approval route for that structural check, and how it differs in Wales, Scotland and Northern Ireland, is set out in the building regulations guide.
What does the Class J 0.2 m limit mean for hooks and rails?
In England, Class J does not permit PV on a pitched roof if it would protrude more than 0.2 metres beyond the plane of the roof slope, measured from the perpendicular with the external surface. The stack of hook bracket, rail and module frame has to fit inside that figure. K2's clamps take frames 25 to 40 mm high, so a designer adds the real components rather than assuming.
Systems that replace the tiles instead of sitting on them are integrated products, covered in the BIPV guide. The planning guide covers the 1 metre edge rule, listed buildings and the prior-approval step for arrays over 50 kW.
What do fire and weathering add on a pitched roof?
The Building Regulations require a roof to adequately resist the spread of fire over it and from one building to another.
A recent government study is a Health and Safety Executive series of 11 large-scale experiments, summarised on 22 December 2025, on PV over pitched roofs in residential buildings. It found that all samples with PV had greater flame spread than the control. Fire climbed further on plastic-backed (class C) panels than on glass-backed (class A) ones, and the support rails appeared to slow spread up the rear surface and act as a fire break.
The summary is interim, residential and may change, so commercial roofs still follow insurer requirements under RC62.
Approved Document B's FAQs add a general caution: the same product can achieve different classifications with different forms, fixings, orientations and substrates, so ask for evidence on the exact build-up. Weathering sits at every hook, hanger bolt and cable entry through the covering, and each needs a flashing or sealing detail.
What should a pitched-roof mounting pack show?
- The covering, pitch and rafter or truss spacing, with hook type and count by roof zone.
- The MCS 012 certificate, or equivalent test evidence, matched to that covering and pitch.
- Wind and snow calculations and the structural engineer's check of the roof frame.
- The stack height against the 0.2 m limit, and the edge set-backs.
- Tile cutting or replacement details, flashing and cable entry details.
- Fire evidence for the build-up, and the insurer's view.
Low-slope membrane roofs use different methods, in flat roof mounting, as do metal sheds in solar panels on metal roofs. Roof details can be sent through the site's enquiry form, and the installations guide sets out what follows.
Sources
- GPDO 2015, Schedule 2, Part 14, Class J, and Building Regulations 2010, Schedule 1, legislation.gov.uk, checked 22 October 2026.
- K2 Systems catalogue: SingleRail, SolidRail and MiniRail; Enstall tiled roof systems, checked 22 October 2026.
- Roof product testing and Digest 489 (22 May 2014), BRE Group, checked 22 October 2026.
- BSI: wind actions National Annex, snow loads National Annex and BS 5534, checked 22 October 2026.
- MCS: becoming certified, grace period ends (10 August 2026) and MIS 3002, checked 22 October 2026.
- Fire spread over pitched roofs fitted with solar panels (summary), Health and Safety Executive for the Building Safety Regulator, 22 December 2025, checked 22 October 2026.
- Approved Document B: frequently asked questions, MHCLG and Building Safety Regulator, checked 22 October 2026.
Common questions
Do roof hooks damage tiles?
Hooks sit under the tile, but some designs need tiles cut, ground or milled to seat properly. K2 lists stainless hooks that need less processing and a webinar on milling tiles, and Enstall offers a Universal Roof Hook with no drilling into the roof structure. Ask for the tile-handling method before work starts.
Is MCS 012 mandatory for commercial roofs?
Not for arrays above 50 kW, because MCS covers installations up to that size. It is the MCS test route for mounting kits on pitched roofs, so a kit certificate is a sensible piece of evidence for any commercial project, alongside a wind and snow calculation for the roof itself.
Does Class J allow panels flush with the tiles?
Yes. In England the limit is how far PV protrudes beyond the plane of the roof slope, 0.2 metres, so flush systems and low on-roof stacks sit inside it. Products that replace the tiles are integrated systems with their own fire and weathering questions, covered in the BIPV guide.
Who checks that the rafters can carry the array?
A structural engineer. A mounting kit certificate covers the kit, and BS 5534 does not cover the structural design of the roof. Part A of the Building Regulations requires the building to carry the combined dead, imposed and wind loads.