What does Class J allow on the wall of a commercial building?

Class J covers buildings other than dwellinghouses and blocks of flats. It lists three kinds of work: microgeneration solar thermal equipment on a building, microgeneration solar PV equipment on a building, and other solar PV equipment on the roof of a building. Only the microgeneration categories can sit on a wall.

Microgeneration takes the meaning in section 82 of the Energy Act 2004, which for electricity is 50 kilowatts, so on the wording of Class J a wall array above 50 kW falls outside it and needs a planning application.

Paragraph J.2 then sets three wall limits. The equipment must not protrude more than 0.2 metres beyond the plane of the wall, must not sit within 1 metre of a junction with another wall or the roof, and, for a building on article 2(3) land, must not be on a wall that fronts a highway.

Article 2(3) land is the land described in Part 1 of Schedule 1 to the Order, which includes National Parks, areas of outstanding natural beauty and conservation areas.

Class J also excludes listed buildings, buildings in the curtilage of listed buildings and scheduled monument sites, and carries two conditions: siting to minimise the effect on appearance and amenity, and removal when no longer needed. This is the English order; the planning guide covers the roof limits and the devolved nations need separate checks.

How does the 0.2 m limit work with real brackets?

The depth of a wall array is bracket, rail and module. K2's masonry bracket for its FacadeRail comes in three heights, 55, 80 and 155 mm, and is described as suitable for insulated and non-insulated facades. Its rail for 30 mm module frames is a further layer.

For example, a 155 mm bracket plus a 30 mm frame is 185 mm before any rail thickness is added, so the stack has to be added up against the 200 mm. This is illustrative arithmetic. How insulation or render counts when finding the plane of the wall is something for the planning authority to confirm.

What do the Building Regulations add for an external wall?

  • Loads. Requirement A1 says a building must sustain and transmit combined dead, imposed and wind loads to the ground, so the wall and its fixings need a structural check for the array.
  • Fire spread. Requirement B4(1) says external walls shall adequately resist the spread of fire over the walls and from one building to another. Approved Document B's FAQs tell designers to consider materials used for the external wall or attachments to it, and add that the same product can achieve different classifications with different forms, fixings and orientations.
  • Taller buildings. Regulation 2 defines a solar panel attached to an external wall as a specified attachment. Regulation 7(2) requires materials in the external wall or a specified attachment of a relevant building to be Class A2-s1, d0 or A1. A relevant building has a storey at least 18 metres up and contains dwellings, an institution (a hospital, home or school where people sleep and are cared for) or a room for residential purposes, a term that includes hotel, hostel, hall of residence and residential home rooms. Regulation 7(3) lists exemptions, including electrical installations and fixings.

Whether a given module and mounting meets Regulation 7 on a given building is for the designer and building control to settle. Integrated facade products are a separate category, in the BIPV guide.

How much does a vertical array yield compared with a roof?

Annual kWh per kWp from PVGIS 5.3 (SARAH3 data, 14% losses, fixed mounting), for three locations:

LocationSouth wall, 90 degreesSouth, 70 degreesSouth roof, 35 degreesEast-west flat roof, 10 degreesEast or west wall
Plymouth7951,0001,122932552
Birmingham710876968800488
Glasgow633774853707432

A south-facing wall makes 73% of the 35 degree roof's yield in Birmingham, with 71% in Plymouth and 74% in Glasgow. An east or west wall makes about half. Over a year a south wall also yields less per kWp than an east-west flat roof, 710 against 800 in Birmingham, but the picture changes in winter.

The winter pattern is the case for walls. In Birmingham in December a south wall gives about 40 kWh per kWp, against 33 for the 35 degree roof, which is 21% more, and 3.1 times the 13 of the east-west flat roof. In June the order reverses: 62 for the wall against 117 for the roof.

A building with winter heating or process load gets a flatter seasonal profile from wall modules, and a full or shaded roof leaves walls as the remaining surface. These are modelled values for an unshaded site, not measurements. The yield by region guide has 13 locations for roof layouts.

How are modules fixed to commercial walls?

K2's WallPV range shows how fixing follows wall type. It says trapezoidal or corrugated sheet metal is among the most common facade claddings in trade or agriculture and uses its MultiRail for them. FacadeRail fixes to solid masonry or concrete with a special console or bracket, and PerfoRail M is for concrete facades with and without insulation. K2 notes that enough gaps remain for rear ventilation despite the largely closed surface, and offers a rail fall-protection part to prevent slipping.

The wall has to carry wind and dead load through those fixings. MCRMA lists guidance on wind loadings on roof and wall cladding (GD15) and on fixings for rainscreen systems (GD11), and says wind loading needs a qualified engineer or software used by an experienced person. Ask the cladding manufacturer whether it accepts penetrations, and share the layout with the insurer.

The wider stages of a project are in the commercial PV installations guide, and roof options are compared in rooftop, ground-mounted and carport. Wall details can be sent through the site's enquiry form.

Sources

Common questions

Can a wall array above 50 kW use Class J?

Not on the wording of Class J. Wall equipment is covered only as microgeneration, which for electricity means 50 kilowatts, and the category for larger PV covers the roof only. A bigger wall array needs a planning application.

Is wall-mounted PV allowed in a conservation area?

Conservation areas are article 2(3) land. There, Class J does not permit PV on a wall that fronts a highway. Other walls can qualify if the 0.2 m, 1 m junction and 50 kW limits are met and the building is not listed. The planning authority can confirm for a specific site.

How much less does a south wall produce than a roof?

On PVGIS figures for Plymouth, Birmingham and Glasgow, a south-facing vertical array makes about 71% to 74% of the annual yield per kWp of a 35 degree south roof. In December in Birmingham it makes about 21% more than the roof, so the gap closes in winter.

Does PV on a wall trigger extra Building Regulations rules?

Requirements A1 and B4 apply to any wall. In addition, Regulation 2 defines a solar panel attached to an external wall as a specified attachment, and Regulation 7(2) sets a minimum reaction-to-fire class for relevant buildings with a storey at least 18 metres up. The designer and building control confirm the position.